Installation of air-intake, heat culverts and asphalt spreading around the new high-   voltage box.
June 2008
  • Air-intake to the BIOAGRO-facility is being installed.
  • The boilers are now combusting.
  • Heat culvert waiting to be installed.
  • Tommy in a heat culvert manhole.
  • Connection of heat culverts.
  • Asphalt spreading around the new high-voltage box.
  • Ditch for heat culverts.
  • Heat culverts to the Skånefrö House