Framework, walls and roof are soon in place.
The work on the BIOAGRO hall is proceeding as it should. Every day changes are being made. The first really big one was when the steel baulks for walls and roof were raised. Follow the development on the pictures.
  • The concrete is being pumped.
  • Grinding of the newly made concrete slab.
  • Steel baulks are being raised.
  • A spring picture of the Bioagro-hall.
  • The roof truss is in place.
  • A wall unit is being placed.
  • The new chimney rises in the sky.
  • Assembling of the top part of the silo.
  • The top part of the silo is floating in the air.
  • Submersion of the top part of the silo.
  • Picture taken from above, featuring the assembly of the silo top.
  • The silo is assembled and on its right place.
  • Special made silo feeders. Can handle all kinds of material. The picture is taken from inside the bin.
  • The silo feeder outlet.
  • Picture taken from the front of the silo feeder.
  • Preparations for the casting of the office loft.