Rainproof and ready for moving in.
Febrile activity prevail at Skånefrö, where trucks, building workers and experts succeeds each other. Every one working to get the buildning ready in time.
  • The top wall units are being raised by a crane.They are isolated and with sheet metal on each side.
  • The ceiling is on the way.
  • The felted roof is finished.
  • The building of the outer shell of the hall is getting close to a finish.
  • Silos with underlying scales container.
  • The boilers from above.
  • The 250 kW boiler to the right, with an assembled screw feeder.
  • The 1500 kW boiler with the screw feeders assembled.