The work on the Bioagro hall is proceeding with detail after detail.
July- August 2007
  • Preparations for mounting the dust filter.
  • The dust filter is lowered down through the roof of the existing building.
  • The filter is manoeuvred to the right spot.
  • A transport redler is being lifted for mounting on the roof.
  • The unloading silo takes shape.
  • Here we can load the pellets into bulk lorries or loosely into an ordinary lorry.
  • The round, blue stacks are the automatic sweep system on the gable hatch on one of the boilers.
  • Ash screwes lengtwise and crosswise.