- Preparations for mounting the dust filter.
|
- The dust filter is lowered down through the roof of the existing building.
|
- The filter is manoeuvred to the right spot.
|
- A transport redler is being lifted for mounting on the roof.
|
- The unloading silo takes shape.
|
- Here we can load the pellets into bulk lorries or loosely into an ordinary lorry.
|
- The round, blue stacks are the automatic sweep system on the gable hatch on one of the boilers.
|
- Ash screwes lengtwise and crosswise.
|