- Assembly of the silo for unloading.
|
- Assembly of the silo for
unloading.
|
- A so called ”goose.neck” redler. It transports the
primary product from the
scales to an elevator.
|
- Flue tubes from the
boilers.
|
- Insulation of the flue tubes.
|
- Quite a bit of electrical
equipment has been assembled.
|
- The boiler oven can be moved
back and forward like a drawer.
|
- The second floor of the
pellets line takes shape.
|
- Assembly of the Universal
elevator .
|
|