Close to the finishing line but not yet passing.
September- October 2007
  • Assembly of the silo for unloading.
  • Assembly of the silo for unloading.
  • A so called ”goose.neck” redler. It transports the primary product from the scales to an elevator.
  • Flue tubes from the boilers.
  • Insulation of the flue tubes.
  • Quite a bit of electrical equipment has been assembled.
  • The boiler oven can be moved back and forward like a drawer.
  • The second floor of the pellets line takes shape.
  • Assembly of the Universal elevator .