The BIOAGRO-facility seen from the inside and installation of feeding cables.
May 2008
  • View of the second floor of the pellets line with the pillar crane in focus.
  • The pillar crane to lift sacks containing additives onto the green platform.
  • The Project Manager Sven-Olof balancing on a pellet screw.
  • View from above of four micro containers for additives.
  • Platform to the right enabling to demonstrate the facility from above.
  • Alf adjusting rolls on the pellets press.
  • Installation of new feeding cables to the new high-voltage box.
  • The feeding cables way into the BIOAGRO-facility.